Posted on October 17, 2020July 16, 2021 by AdminDRC: Lots 1–3 Approval Lot 1 DRC Request 3 Approval Saturday, October 17, 2020Categorized: Design Review Committee, Ted BerteleTagged: DRC, Jeff Keicher, Lot 1, Lot 2, Lot 3, Ted Limited